What was achieved
Westwood Energy installed 252.80kW of PV on this Lancashire poultry unit. Installed to mitigate shading impact from feed bins and mixing rooms, this installation was easily modelled using SolarEdge’s Designer platform. We were able to highlight areas of high shading impact, and avoid them using smart design.
The numbers…
241MWh pa generated.
73% consumed on-site.
35% of import demand off-set.
£58,400 pa saved.
The equipment…
640no. Trina Vertex 395W Modules.
2no. 100K SolarEdge Inverters.
320no. P801 SolarEdge Optimisers.
1no. Van Der Valk Munting System.
1no. SolarEdge G100 Metering Solution.