What Was Achieved
Westwood Energy installed 15.39kW of PV to this new build day care nursery in East Yorkshire. We worked inline with the client’s other contractors to ensure a smooth delivery and in keeping with their timelines. We also deployed SolarEdge’s Firefighter Gateway, ensuring safe and rapid DC shutdown when triggering of the buildings fire alarm system occurred.
This system was installed as part of a wider build to extend the existing nursery, deploying PV, heat pumps along with a wide range of environmentally friendly building techniques, ensuring the development of a state of the art facility.
This installation is phase one of a two part scheme which will eventually deliver 33kW of PV generation.
The numbers…
186MWh pa generated.
66% consumed on-site.
39% of import demand off-set
£5,800.00 pa saved.
The equipment…
38No. Viridian 405W Modules.
1No. 12.5K SolarEdge Inverter.
38No. S500B SolarEdge Optimisers.
1No. Viridian Inlay Mounting System.
1No. SolarEdge Metering Solution.
1No SolarEdge Firefighter Gateway.