THE BRIEF

The client required a solar PV system to support their energy needs at their steel stockholding warehouse. The system had to be integrated seamlessly with the ongoing construction and adhere to stringent safety standards, including the ability to quickly shut down the system in case of a fire.

scunthorpe all steels warehouse with solar panels
WHAT WE INSTALLED
blue line drawing of solar panel and sun
sky view of scunthorpe warehouse featuring solar panels
HOW WE DID IT

The installation was carefully planned and executed to fit within the construction schedule. Working closely with the shed builder and M&E contractor ensured that all aspects of the build were integrated efficiently. The SolarEdge Firefighter Gateway was installed to provide a rapid DC shutdown capability, enhancing safety in case of a fire alarm.

OUR RESULTS


It has been a pleasure to work with the team at Westwood Energy, from initial consultation to design and installation, the project has been managed and delivered in a very professional and efficient manner. All staff approached the project with a very positive and motivated mind set. We can’t thank you enough.”

Tony GabbuttAll Steels Trading Ltd