225kW, Yorkshire, Manufacturing

Solar PV roof mount installation for A B Graphic International, manufacturers of print finishing equipment in Yorkshire.

What was achieved

Westwood Energy installed 225kW of PV to this print finishing equipment manufacturing facility in East Yorkshire. We worked inline with the client’s other contractors to ensure a smooth delivery and in keeping with their timelines. We also deployed SolarEdge’s Firefighter Gateway, ensuring safe and rapid DC shutdown when triggering of the buildings fire alarm system occurred.

This system was installed as part of a wider electrical upgrade, we also provided mains incoming upgrade services, acting as consultant with the DNO and providing supply and build of a new HV substation.

Given the shallow pitch of all elevations utilised, we were able to install modules on elevations facing North, East, South and West.

The numbers…

186MWh pa generated.

74% consumed on-site.

23% of import demand off-set.

£44,900.00 pa saved.

The equipment…

530 x Trina Vertex 430W Modules.

1 x 100K SolarEdge Inverters / 1No. 90K SolarEdge Inverters.

265 x P950 SolarEdge Optimisers.

1 x Sunfixings MRD S Steel Sheet Mounting System.

1 x SolarEdge G100 Metering Solution.

1 x SolarEdge Firefighter Gateway.

1 x HV Substation Build.

Final Outcome

From the client

Westwood delivered a highly professional service, we strongly recommend them for any Solar PV installation and look forward to working with them again.

Steve Curtis, Director – A B Graphic International