225kW | Yorkshire

OVERVIEW
  • 225kW Solar PV Roof Mount Installation
  • Location: East Yorkshire, England
  • Sector: Manufacturing (Print Finishing Equipment)

How much could solar PV save you?

THE BRIEF

The client required a substantial solar PV system to meet their energy needs while aligning with a major electrical upgrade project. The installation needed to be completed in coordination with other contractors to adhere to the client’s tight timelines. Additionally, safety measures such as SolarEdge’s Firefighter Gateway were essential for rapid DC shutdown in case of a fire alarm.

manufacturing unit in yorkshire with solar panels on roof and car park
WHAT WE INSTALLED
blue line drawing of solar panel and sun
sky view of manufacturing unit with solar panels and red vans in car park
HOW WE DID IT

The installation was meticulously planned to align with the client’s electrical upgrade and construction schedules. Modules were installed on all roof elevations—North, East, South, and West—taking advantage of the shallow pitch of the roof to maximise energy production. Coordination with other contractors ensured the project adhered to timelines, and the deployment of SolarEdge’s Firefighter Gateway guaranteed safety and compliance.

We also managed the mains incoming upgrade and worked closely with the DNO to facilitate the supply and build of a new HV substation, integrating all elements of the project smoothly.

OUR RESULTS

“Westwood delivered a highly professional service, we strongly recommend them for any Solar PV installation and look forward to working with them again.”

Steve Curtis, DirectorA B Graphic International

View other commercial PV case studies