The client required a substantial solar PV system to meet their energy needs while aligning with a major electrical upgrade project. The installation needed to be completed in coordination with other contractors to adhere to the client’s tight timelines. Additionally, safety measures such as SolarEdge’s Firefighter Gateway were essential for rapid DC shutdown in case of a fire alarm.
225kW | Yorkshire
Westwood Energy successfully completed a 225kW solar PV roof mount installation for A B Graphic International, a manufacturer of print finishing equipment in East Yorkshire. This project was part of a broader electrical upgrade, including a mains incoming upgrade and the construction of a new HV substation. The installation, featuring a comprehensive SolarEdge solution, was designed to integrate seamlessly with the facility’s existing infrastructure and ensure operational efficiency.
KEY FACTS
- 225kW Solar PV Roof Mount Installation
- Location: East Yorkshire, England
- Sector: Manufacturing (Print Finishing Equipment)
How much could solar PV save you?
Modules: 530 x Trina Vertex 430W
Inverters: 1 x 100K SolarEdge, 1 x 90K SolarEdge
Optimizers: 265 x P950 SolarEdge
Mounting System: Sunfixings MRD S Steel Sheet
Metering Solution: SolarEdge G100
Additional Equipment:
- 1 x SolarEdge Firefighter Gateway
- 1 x HV Substation Build
The installation was meticulously planned to align with the client’s electrical upgrade and construction schedules. Modules were installed on all roof elevations—North, East, South, and West—taking advantage of the shallow pitch of the roof to maximise energy production. Coordination with other contractors ensured the project adhered to timelines, and the deployment of SolarEdge’s Firefighter Gateway guaranteed safety and compliance.
We also managed the mains incoming upgrade and worked closely with the DNO to facilitate the supply and build of a new HV substation, integrating all elements of the project smoothly.
The solar PV system generates 186MWh annually, with 74% of the energy consumed on-site and 23% of import demand offset. This translates to significant annual savings of approximately £44,900, demonstrating the effectiveness of the installation in reducing energy costs and enhancing operational efficiency for A B Graphic International.
”“Westwood delivered a highly professional service, we strongly recommend them for any Solar PV installation and look forward to working with them again.”
Steve Curtis, DirectorA B Graphic International